skip to content
Menu
800 Series White Moulded
822 800 Part BG 822 0124 RA ANGLEON
900 Series White Moulded
922 900 Part BG 922 0125 RA ANGLEON
Grid
RNBS3 RNBS Part BG RNBS3 0124 RA ANGLE
Euro Module
NBSEMR4 NBS Part BG NBSEMR4 0125 RA ANGLE
Nexus Metal
NBS22G NBS Part BG NBS22G 0125 RA ANGLEON
Evolve
RA ANGLEBASE
Flatplate Screwless
FBS22G FBS Part BG FBS22G 0124 RA ANGLEOFF
Storm Weatherproof
RA CLOSED
Decorative Weatherproof
RA CLOSED
IP55 Weatherproof & Accessories
WPB24 WPB Part BG WPB24 0120 RA CLOSED
Metal Clad
MC522 MC Part BG MC522 0125 RA MOUNTANGLEON
Part M
PM22DPOB PM Part BG PM22DPOB 0125 RA ANGLEON
Ceiling Accessories
753 700 Part BG 753 0200 A1 BASE
Junction Box & Contractor Range
RA BASE
Safety Alarms
A1 OFF
Close
Menu Close
Menu

Things You'll Need

May require additional green and yellow sleeving (circumstance dependant)

BG Socket

Pliers

Screwdriver

Spirit Level


Upgrading a 2 gang socket

Before starting any electrical work, make sure that the mains supply is turned off at the consumer unit.

At the consumer unit, find the trip switch which protects the circuit and turn it all the way off. The indicator window should stay green.

Unscrew the retaining screws on the socket so that it is released from the mounting box.

Gently ease the socket from the mounting box to show the wiring.

There will generally be three different wiring configurations. This photo shows a single wire of each colour connected to each terminal.

Alternatively, there could be two or three wires of each colour connected to each terminal.

Whichever wiring configuration you find, unscrew each terminal screw to release the wires. You should now be able to remove the socket and place it to one side.

Line up the new socket and take note of where each terminal is located.

Place the blue wire(s) into the neutral terminal, brown wire(s) into the live terminal and the green/yellow wire(s) into the earth terminal. The terminals on the socket are colour coded to help locate the correct one.

Make sure that the wires are fully inserted into the terminal and that no bare copper wire is visible. Tighten the screws securely onto the copper wire, not the outer sheathing.

Gently press the socket back into place over the mounting box. Take care not to trap any wires between the wall and the socket.

Insert and tighten the retaining screws provided. Use a spirit level to make sure that the socket is level. Restore the power at the consumer unit and test.


Things to think about

For your safety, this product must be installed in accordance with local Building Regulations.

If in any doubt, or where required by the law, consult a competent person who is registered with an electrical self-certification scheme. Further information is available online or from your Local Authority.

Please read carefully and use in accordance with these safety wiring instructions. Before commencing any electrical work ensure the supply is switched off at the mains. Either by switching off the consumer unit or by removing the appropriate fuse. Wiring should be in accordance with the latest edition of the IET regulations (BS 7671) To prevent fire hazard always use cable of the correct rating, size & type for the application.

Any bare earth wires must be covered with appropriate green/yellow sleeving. Warning do not exceed the load rating of this device as stated on the rear of the product.

Always refer to and follow precisely the manufacturer’s instructions when fitting a new socket. Any electrical installation must comply with Building Regulations, specifically Part P, which came into effect on 1 January 2005, with the amended version coming into effect on 6 April 2006. A further update came into force on 6 April 2013. Refer to these regulations before carrying out any electrical work. Download at www.planningportal.gov.uk.

 

Health & Safety

Replacing a socket is non-notifiable under Part P, and therefore it is not necessary to have the work carried out by a qualified electrician, or to inform your local authority building inspector of the work, except in high-risk areas, or special locations, such as bathrooms.

For a full list of these locations, refer to Part P. Part P strongly advises taking advice from a qualified electrician for carrying out any DIY electrical work. All electrical work must be tested and inspected.

This guide shows fitting a metal socket onto a plastic flush mounting box and the instructions shown over page only relate to plastic mounting boxes. If you have metal mounting boxes, earthing requirements will vary, so refer to the manufacturer’s guidelines.

If the socket you are changing has two earth terminals, this means that it has a dual earth facility, which is required if you need to comply with Regulation 607 of BS7671. As always, follow the manufacturer’s guidelines and recommendations in such instances.

If you find earth wires are bare, you must sheathe them with green and yellow sleeving.

Colours used in hard-wire installations (including cables supplying sockets) have changed in recent years. The table below shows the different colours for wires, prior to and after April 2004.